Our goal is to create this channel. That every engineer who involves in the project field needs planning at every step. And this software is very important for learning planning. And In sha Allah I will explain every step of how you can become a successful planning engineer. I will explain what is the responsibility of the planning engineer to do it
How the project is scheduled
How the project is monitored
What is project management?
I will explain to you in full detail the five steps of project management that are very important. And he's writing down the steps.
01- PLANNING
02- MONITORING
03- MANAGING
04- CONTROLLING
05- REPORTING
And if anyone has any problem at all, feel free to contact me on the What's App or by email.
We are also providing trainings, please contact us for more details.
PLANNING - P6
💻🔎 HOW TO CONVERT AN UPDATED SCHEDULE TO BASELINE IN PRIMAVERA P6
💻🔎 REMOVE ACTUALS AND PROGRESS EASILY
🕒DURATION: 21 MINUTES
🎞️TUTORIAL: https://youtu.be/vRbjC4jNfyc
📢📑DESCRIPTION:
Learn how to quickly create a clean baseline from an updated Primavera P6 schedule using two proven methods—Manual Updates and Global Change. I’ll show you how to remove actual dates, clear % complete, and reset progress without losing your schedule data. Perfect for construction, oil & gas, infrastructure, and EPC planners who want accurate baselines in Primavera P6.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #PrimaveraTutorial #P6Baseline #ConstructionPlanning #ProjectManagement #BaselineFromUpdatedSchedule #PrimaveraTips #RemoveActualsP6 #P6GlobalChange #BaselineCreation #PrimaveraTraining #PlanningEngineer #CreateBaselineInP6 #ResetProgressPrimaveraP6 #RemoveActualsPrimaveraP6 #ClearPercentCompleteP6 #PrimaveraP6GlobalChange #UpdatedScheduleToBaseline #PrimaveraP6ScheduleControl #BaselineCreationTutorial #PrimaveraP6Planning #P6ProgressReset #PrimaveraP6ProjectManagement #ConstructionSchedulingP6 #PrimaveraP6ForBeginners #planningp6 https://youtu.be/vRbjC4jNfyc
4 hours ago | [YT] | 0
View 0 replies
PLANNING - P6
💻🔎 HOW TO RESOLVE START & FINISH TIME ERROR PRIMAVERA P6
💻🔎START & FINISH TIME MISMATCH WITH CALENDAR
🕒DURATION: 16 MINUTES
🎞️TUTORIAL: https://youtu.be/OFLT3J9pm6c
📢📑DESCRIPTION:
n this detailed Primavera P6 tutorial, we address a common issue where activity start and finish times do not align with the project calendar. Many planners and schedulers face situations where activities begin at 8:00 AM or end before the expected working hours, even though the calendar is set correctly.
This video explains the three major causes of this problem:
🔴Decimal values in original duration
🔴Decimal lag values in activity relationships
🔴Use of multiple or misaligned calendars
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #PrimaveraP6Tutorial #P6CalendarIssue #P6StartTimeMismatch #P6FinishTimeMismatch #PrimaveraP6StartTime #PrimaveraP6Schedule #P6TimeMismatch #P6DurationIssue #P6DecimalDuration #PrimaveraP6Tips #P6LagTimeIssue #P6ScheduleCalendar #P6ActivityMismatch #FixP6StartTime #P6TimeAlignment #PrimaveraCalendarFix #ActivityStartTimeIssue #P6TimeRoundingProblem #PrimaveraP6DurationFix #PlanningP6 https://youtu.be/OFLT3J9pm6c
3 weeks ago | [YT] | 0
View 0 replies
PLANNING - P6
Hiring – Planning Engineer (UCH-II - OGDCL Project)
AJC Company (OGDCL Project) Location, Balochistan, Pakistan requires a Planning Engineer.
🌟Salary: Up to PKR 100000-140000 (depends on experience)
🌟Location: Balochistan, Pakistan
🌟Rotation: Stay at site, 6–8 day’s vacation after one month
Only candidates interested in working at the above-mentioned location should send their CVs. Interview will be conducted by PlanningP6 expert.
👉🏻Hello@Planningp6.com
👉🏻+923088663797 (WhatsApp Only – Text Massages)
#Hiring #PlanningEngineer #OGDCL #BalochistanPakistan #EngineeringJobs #AJCCompany #PlanningP6 PlanningP6.com
1 month ago | [YT] | 2
View 0 replies
PLANNING - P6
💻🔎 FIX PLANNED VALUE AND SCHEDULE % COMPLETE MISMATCH IN PRIMAVERA P6
💻🔎 | WHY PLANNED VALUE DOESN’T MATCH
🕒DURATION: 09 MINUTES
🎞️TUTORIAL: https://youtu.be/CMRK3e_iTCQ
📢📑DESCRIPTION:
Struggling with Planned Value, Plan %, or Schedule % Complete mismatches in Primavera P6?
In this step-by-step tutorial, we’ll walk you through resolving one of the most common issues faced by planning engineers — the mismatch between Planned Value, Schedule % Complete, and Excel S-Curve data.
Whether you're working on man-hours, cost, or units, mismatches between Primavera P6 and Excel reports can lead to inaccurate S-curves, misleading progress metrics, and project reporting errors.
Whether it’s a small timing error or a baseline misconfiguration, this tutorial will help you fix the root causes and produce clean, accurate reports for your project team or client.
Includes tips on Global Change filters, resource assignment views, and fixing date cut-off mismatches during schedule runs.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6, #PlannedValue, #SchedulePercentComplete, #PlanPercentMismatch, #PrimaveraGlobalChange, #ExcelSCurve, #BaselineSchedule, #ConstructionPlanning, #ProjectControls, #PlanningEngineer, #EarnedValueManagement, #PrimaveraP6Errors, #ManhourLoadedSchedule, #PrimaveraP6Tips, #PrimaveraP6Training, #PrimaveraP6Tutorial #PrimaveraP6, #PlannedValueMismatch, #SchedulePercentCompleteMismatch, #PlanPercentCompleteFix, #ExcelSCurveTutorial, #PrimaveraP6ScheduleIssues, #BudgetedUnitsMismatch, #PrimaveraBaselineFix, #ProjectScheduleCorrection, #ResourceAssignmentError, #PrimaveraP6GlobalChange, #ConstructionScheduleFix, #CostLoadedScheduleFix, #EarnedValueMismatch, #ScheduleProgressMismatch, #ProjectControlsTips, #PlanningBasics, #PrimaveraP6Tips, #ScheduleDataCorrection, #ScheduleUpdateError, #PrimaveraSchedulingErrors, #ConstructionPlanningTips #planningP6 https://youtu.be/CMRK3e_iTCQ
1 month ago | [YT] | 3
View 0 replies
PLANNING - P6
💻🔎 HOW TO PREPARE REVISED SCHEDULE IN P6
💻🔎 MAKE REVISED SCHEDULE FOR ANY CHANGES IN P6
🕒DURATION: 14 MINUTES
🎞️TUTORIAL: https://youtu.be/t3iz1Fhhdlg
📢📑DESCRIPTION:
Preparing recovery or revised schedules is a very common task during project execution, monitoring and controlling. When there is a slippage in the project finish forecast date or scope addition or omission or a change in the construction methodology or constructability method, the schedule baseline is no longer effective in the monitoring and controlling process. Therefore, a recovery or revised schedule should be prepared, approved and maintained as a new baseline to monitor and control the project.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#primaveraP6 #revisedschedule #projectmanagement #scheduleupdate #constructionmanagement #projectplanning #tutorial #p6tips #scheduling #engineering #learnP6 #projectcontrols #construction #projectmanager #globalchange #activitystatusupdate #timelinebaseline #progressoverride #actualdatesreset #baselinecopy #scenarioplanning #resourceleveling #earnedvaluemanagement #whatifanalysis #montecarlosimulation #criticalpathmethod #precedencediagrammingmethod #constructiontips #pmbok #projectmanagementtraining #projectplanningtips #projectmanagementtools #projectmanagementcertification #p6software #p6hacks #p6bestpractices #maximizep6 #learnprimavera #primaveratraining #constructionplanning #PlanningP6 #Revised_Schedule, #Revised_schedule_Preparation_for_any_change_p6, #primavera_p6_complete https://youtu.be/t3iz1Fhhdlg
1 month ago | [YT] | 1
View 0 replies
PLANNING - P6
💻🔎 HOW TO PREPARE SCHEDULE FOR WATER TANK PROJECT IN PRIMAVERA P6
💻🔎 SCHEDULE COMPLETE PROJECT IN P6
🕒DURATION: 01 HOUR & 01 MINUTES
🎞️TUTORIAL: https://youtu.be/_4UA5Dc3d_Q
📢📑DESCRIPTION:
Learn how to effectively schedule a water tank project using Primavera P6. This comprehensive tutorial covers essential steps from project setup to completion. Discover how to create a detailed work breakdown structure (WBS), define activities, establish relationships, assign resources, and track progress. Gain insights into critical path analysis, resource allocation, and cost control. Master the art of creating realistic project schedules and optimizing resource utilization for successful water tank project execution.
#primaverap6 #projectscheduling #projectmanagement #construction #watertank #projectcontrols #engineering #constructionmanagement #projectplanning #watersupplyproject #p6tutorial #projectschedule #watertankproject #constructionplanning #civilengineering #infrastructureproject #projectcontrols #p6training #projectmanagementtools #primaverap6tutorial #watertankproject #projectscheduling #constructionplanning #projectmanagementtips #projectcontrols #civilengineering #infrastructureproject #p6training #watertankconstruction #critical_Path #planningp6 https://youtu.be/_4UA5Dc3d_Q
1 month ago | [YT] | 2
View 0 replies
PLANNING - P6
💻🔎 PRIMAVERA P6 25.12 VERSION
💻🔎 HOW TO DOWNLOAD P6 25.12, INSTALLATION, FEATURES & UPDATES EXPLAINED
🕒DURATION: 26 MINUTES
🎞️TUTORIAL: https://youtu.be/y4XRtvYwpvc
📢📑DESCRIPTION:
In this detailed tutorial, we explore Oracle Primavera P6 Professional Project Management – Version 25.12, covering installation, database configuration, and a complete overview of new features and enhancements.
Oracle has officially released Primavera P6 25.12 across all platforms, including P6 Professional (PPM), P6 EPPM, and Team Member Web, with multiple performance improvements, new controls, and critical bug fixes.
🌟How to download Primavera P6 25.12
🌟Step-by-step installation process
🌟How to add new databases and connect existing databases
🌟Overview of 26 updates in P6 Professional
🌟Overview of 32 updates in P6 EPPM
🌟Overview of 12 updates in Team Member Web
🌟Where Oracle fixed common errors and stability issues
🌟How new features improve planning, scheduling, and project controls
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #PrimaveraP62512 #OraclePrimavera #PrimaveraP6Professional #P6Professional #P6LatestVersion #P6Update #P6NewFeatures #PrimaveraP6Update #PrimaveraP6Tutorial #P6Installation #P6DatabaseConfiguration #P6Standalone #P6EPPM #PrimaveraEPPM #PrimaveraP6Setup #ProjectControls #PlanningP6 #ProjectScheduler #PlanningEngineer #ProjectPlanning #ScheduleManagement #ProjectManagement #PrimaveraP6Training #P6Training #P6TipsAndTricks #ProjectControlsTraining #PrimaveraBaseline #P6GlobalChange #P6Scheduling #P6Reporting #P6Performance #PrimaveraP6_25_12_Download https://youtu.be/y4XRtvYwpvc
1 month ago | [YT] | 7
View 0 replies
PLANNING - P6
💻🔎HOW TO CREATE ASSIGN AND FILTER ACTIVITY CODES IN PRIMAVERA P6
💻🔎ACTIVITY CODES FOR SCHEDULE P6
🕒DURATION: 22 MINUTES
🎞️TUTORIAL: https://youtu.be/XZZ36TsTy9A
📢📑DESCRIPTION:
In this Primavera P6 tutorial, we show you how to create, assign, and manage Activity Codes within your project. Whether you're handling large enterprise-level schedules or tracking small projects, Activity Codes help you sort, filter, and report with efficiency.
Oracle Primavera P6 provides the capability to setup and assign Activity Codes to activities in your projects. Activity Codes are used to classify, categorize, and organize activities based on your organization's reporting needs. Activity Codes are usually created and assigned at the beginning of the project.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #ActivityCodes #ProjectPlanning #P6Tutorial #ConstructionManagement #ProjectControl #OraclePrimavera #EngineeringTools #ActivityCodeGroups #FilterActivities #ScheduleOptimization #PlanningP6 #ActivityCodeSetup, #GlobalCodes, #ProjectLevelCodes, #AssignActivityCode, #P6ActivityManagement, #ActivityCodeBestPractices, #ActivityCodeReports, #ActivitySorting, #PrimaveraTipsAndTricks, #ActivityCodeUsage, #FilterByActivityCode, #ActivityCodeApplication, #P6LayoutCustomization
https://youtu.be/XZZ36TsTy9A
1 month ago | [YT] | 0
View 0 replies
PLANNING - P6
💻🔎HOW TO CREATE COMPLETE PROJECT OF OIL & GAS CONDENSATE STORAGE TANKS FACILITY PRIMAVERA P6 SCHEDULE
🕒DURATION: 40 MINUTES
🎞️TUTORIAL: https://youtu.be/ngY8qh5IBvM
📢📑DESCRIPTION:
Comprehensive explanation of an oil and gas condensate storage facility project. How to create a comprehensive schedule and activity sequence is demonstrated in this video. Developing a comprehensive project schedule for a condensate storage facility within a petrochemical oil & gas field. The project encompasses six key stages: Project Award, Engineering, Procurement, Mobilization, Construction, and Project Completion. Each stage involves specific activities, ranging from design and procurement to construction and commissioning. The scope of work includes the construction of storage tanks, piping, equipment, instrumentation, civil foundations, and firefighting systems, all detailed in contract documents and 3D models. Crucial aspects of the process include adherence to client specifications, implementation of rigorous safety protocols, and accurate resource allocation based on industry productivity norms. The schedule incorporates detailed activity definitions, durations, dependencies, and resource assignments, enabling effective progress monitoring and project completion within the defined timeframe and budget.
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻YOUTUBE: youtube.com/@PLANNINGP6/featured
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻INSTAGRAM: www.instagram.com/planningp6/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#completeproject, #oilandgasprojectscheduling, #p6scheduling #PrimaveraP6 #ProjectManagement #OilAndGas #CondensateStorage #ConstructionPlanning #ProjectScheduling #PrimaveraP6Tutorial #OilAndGasIndustry #StorageTankConstruction #ProjectPlanning #PrimaveraP6Training #EngineeringProjects #FacilityManagement #ConstructionManagement #PrimaveraP6Scheduling #planningp6
https://youtu.be/ngY8qh5IBvM
1 month ago | [YT] | 0
View 0 replies
PLANNING - P6
PRIMAVERA P6 25.12 CUMULATIVE UPDATE SUMMARY
Primavera P6 version 25.12 is now available, delivering cumulative improvements across P6 Professional, Enterprise Project Portfolio Management (EPPM), and P6 Team Member Web. This release focuses on enhanced stability, performance, and usability, along with targeted bug fixes and functional improvements.
For a complete feature breakdown, download instructions, and step-by-step installation guidance, refer to the blog link below.
planningp6.com/primavera-p6-version-25-12-how-to-d…
🤝🙏: JOIN @PLANNINGP6 FOR MORE:
👉🏻WEB: planningp6.com/
👉🏻YOUTUBE: youtube.com/@PLANNINGP6/featured
👉🏻LINKEDIN: www.linkedin.com/in/planning-p6/
👉🏻FACEBOOK: www.facebook.com/profile.php?id=100088892457476
👉🏻SHOP: planningp6.com/p6-shop/
📇📼: @PLANNINGP6 PLAYLISTS:
▶ PRIMAVERA P6 SOFTWARE (ALL VERSIONS): www.youtube.com/playlist?list...
▶ P6 SOFTWARE & SCHEDULING: www.youtube.com/playlist?list...
▶ COMPLETE PROJECTS: www.youtube.com/playlist?list...
▶COST AND CLAIM MANAGEMENT: www.youtube.com/playlist?list...
▶MONITORING PHASE: www.youtube.com/playlist?list...
▶CONTROLLING PHASE: www.youtube.com/playlist?list...
#PrimaveraP6 #PrimaveraP62512 #PrimaveraP6Download #PrimaveraP6Installation #PrimaveraP6NewFeatures #OraclePrimavera #ProjectControls #PlanningEngineer #ProjectScheduler #ConstructionPlanning #EPCProjects #PMOTools #ProjectManagement #PlanningP6
planningp6.com/primavera-p6-version-25-12-how-to-d…
1 month ago | [YT] | 0
View 0 replies
Load more